Testing and prototype work is being done as of 1/05
This is a production piece that will be available by mid summer.
Next Project: Disc Brake set up for the Sea Wing .
This is prototype stage only testing and pricing are scheduled for mid summer.
|
New projects
Updating the 45 degree brackets for a stronger support and easier inspection.  These brackets have shown failure cracks and separation after extended airframe use. Examples from right to left show
a new unfinished bracket. Middle piece is 150 hrs. old and is showing flaking
in powder coating and some stress risers showing. Left piece has failed
at 200 hrs.
 This is the new system that has eliminated
any welds and is easily disassembled for inspection purposes and mantainance.
|